Contact

Green Power Supply

Corporate green power supply

Chenya Energy both generates and retails electricity, supplying green power directly from our own solar plants to help companies meet RE100 and decarbonisation targets.

Buy Green Power Enquire about a plan

Overview

Service overview

Most retailers have to buy green power from third parties. Chenya is different — we develop, build and operate the plants ourselves. Generation through to wheeling all happens within one company, which makes both the supply source and our ability to deliver far more certain.

Supplied directly from our own plants

332 MW of our own solar capacity means no reliance on third-party procurement — supply is stable and traceable to a specific site.

Flexible contract structures

Long-term or phased contracts designed around your load profile, letting you scale in line with your decarbonisation timeline and budget.

A proven wheeling record

With around 27% of the green power wheeling market and a base of corporate clients, we know Taipower's wheeling process and how to keep it on schedule.

Generation data you can check yourself

Clients log in to the generation data portal on this site and download hourly output for their plants directly — no need to wait for a report from us.

One team from start to finish

The same team handles everything from the first conversation through grid setup to billing and certificates.

Who it serves

Who it serves

Large electricity users

Companies required under the Renewable Energy Development Act to source a set proportion of renewable energy.

  • Lock in supply and price with a long-term contract
  • Help weighing self-build against purchased supply

RE100 and ESG-driven companies

Companies that need traceable certificates to report their carbon reductions.

  • Green power traceable to a named site
  • Certificate timing aligned to your reporting cycle

Office buildings and industrial parks

Sites where landlord and tenants share a meter and green power has to be apportioned.

  • Clarifying meters and apportionment
  • Multi-site, multi-stage wheeling arrangements

Achievements

By the numbers

332 MW

Installed capacity

4.39 hundred M kWh

Annual generation

27 %

Wheeling market share

17 k tonnes

Annual CO₂ reduction

Process

How it works

Five stages, from the first conversation to your certificates.

  1. 1

    Initial discussion

    We review your consumption, site spread and decarbonisation targets to confirm feasibility.

  2. 2

    Load analysis and planning

    Supply volume, contract term and wheeling schedule are planned around your load curve and site conditions.

  3. 3

    Contract signing

    Once commercial terms are agreed, we sign the Corporate PPA.

  4. 4

    Grid setup and wheeling

    We complete the Taipower wheeling application, meter setup and go live.

  5. 5

    Certificates and billing

    Monthly generation and wheeling data, plus support in obtaining Taiwan Renewable Energy Certificates (T-REC).

Not sure which plan fits your company?

Share your consumption and site details and we will come back with an initial supply and wheeling assessment.

Buy Green Power